Location Veldhoven

 

It all started…

More than 20 years ago, the existence of the current Frontal began. Initially, a collaboration between Frontal (NL) and a locally operating manufacturer of windows and doors in Carei (RO). This collaboration has soon expanded and the site in Carei became the main production site of Frontal. From then on, the focus was entirely on Aluminum.

 

The last decades Frontal continued to professionalize. Frontal is equipped nowadays with highly advanced CNC-controlled machinery, which makes even the most challenging solutions possible. On 3 different locations in Carei and Veldhoven, Frontal now has over 6.000 m2 of production and logistic facilities. Here, every day, more than 60 experienced employees work on the most prominent projects.

 

Due to an increasing demand for the supply of glazed elements and the pre-montage of our elements in Prefab wood or concrete elements, Frontal in the Netherlands moved to Veldhoven a few years ago. Together with the sales and engineering office, Frontal now also has sufficient space and facilities to be able to deliver projects fully glazed.

 

 

Locations

 

Veldhoven (NL)

Logistics - Glazing/Prefab

Carei 1 (RO)

Windows and Doors production

3 CNC working stations (MECAL/EMMEGI)

2 Double mitre saws (MECAL/ELUMATEC)

Notching machine (GRAULE)

CNC crimping machines (ATLA COOP)

Glazing bead measuring sawing system (TIGERSTOP)

Carei 2 (RO)

Facades / Curtain walls and Specials production

2 CNC working stations (MECAL/ELUMATEC)

1 Double mitre saw (ELUMATEC)

Notching machine (GRAULE)

CNC crimping machine (ATLA COOP)

Glazing bead measuring sawing system (TIGERSTOP)